Migration Risk Assessment: Do the Time Arithmetic First, Then Set Priorities
Post-quantum scheduling turns on one inequality: if data shelf-life plus migration time exceeds the time until the quantum threat arrives, you are already late. Here is the full method — risk matrix and risk register included.
First, the time arithmetic: the Mosca inequality
The most common misjudgement in post-quantum migration is phrasing the question as “how long until a quantum computer?” Michele Mosca of the University of Waterloo reframed it into three estimable quantities:
- X (shelf-life): how many years the data must remain confidential, starting today — medical records, genomic data, long-term contracts and state secrets all differ.
- Y (migration time): how many years it will actually take to move the relevant systems to quantum-resistant algorithms; for large organisations this is measured in years.
- Z (threat timeline): how long until a cryptographically relevant quantum computer (CRQC) capable of breaking RSA and ECC arrives. Nobody can name the year; national roadmaps offer planning figures, not predictions.
The punchline: when X + Y > Z, you are already late even if Z is a decade away — because an adversary can execute “harvest now, decrypt later” today, recording ciphertext and decrypting it the day Z arrives. The X clock starts ticking the moment the data is recorded, not the moment the quantum computer switches on.
Of the three quantities, Z is the hardest to estimate, and it has no authoritative answer. Published expert surveys — the Global Risk Institute’s annual Quantum Threat Timeline Report, for example — give probability distributions, not dates; the migration timelines published by governments and standards bodies (the CNSA 2.0 transition milestones, or the draft NIST IR 8547 framing of quantum-vulnerable algorithms as deprecated by 2030 and disallowed by 2035) are policy planning anchors rather than forecasts. The pragmatic approach is to schedule against a conservative Z: plan as if the threat arrives early, because if Y is underestimated there is no window left in which to recover. Write the Z assumption you used into the assessment document itself, so that at review time you can tell whether a priority changed because the threat moved or because the business did.
The unit of assessment: system × data
“Core systems first” has no scheduling value. A useful assessment opens each system up along three dimensions:
| Dimension | Question | High-risk signal |
|---|---|---|
| Data sensitivity | What happens if this leaks? Personal data, trade secrets, or public content? | Irreversible harm; regulatory penalties |
| Data shelf-life (X) | Until which year must this data stay confidential? | X ≥ 10 years |
| Exposure | Does ciphertext cross the public internet? Can it be recorded in bulk? Is key exchange purely classical? | Public TLS termination, long-lived connections, exported archive backups |
Multiply by migration difficulty — vendor dependencies, embedded devices, how negotiable the protocol is — and you get a sortable risk list. The rule of thumb: publicly exposed + long shelf-life + purely classical key exchange goes first, because that is the complete victim profile for harvest-now-decrypt-later. Internal, short-shelf-life data can wait, sometimes until natural hardware refresh.
Turning scores into a schedule
A three-tier sort is the common way to convert scores into a programme:
- Act now: X + Y already exceeds a conservative estimate of Z, and the exposure is public. Deploy hybrid key exchange first to close the recording risk — it needs no certificate change and pays off immediately.
- Planned migration: long X but controlled exposure, or the system sits inside a vendor’s roadmap. Put it in the annual plan and track the vendor’s post-quantum release milestones.
- Monitor: short shelf-life and easily replaceable algorithms. Register the system and re-score it annually as estimates of X and Z move.
One category needs its own column: long-lived signature assets — root certificates, firmware signing, code signing. Their “shelf-life” is a verification horizon: firmware signed today must still verify in ten years, and the forgery risk crystallises the moment Z arrives, with no way to patch it retroactively.
The deliverable: what a risk register looks like
The endpoint of the assessment is not a slide deck but a maintained risk register. Each entry carries at least these fields:
| Field | Example |
|---|---|
| Asset / system | Public API gateway cluster |
| Data class and shelf-life | User identity data, X ≈ 15 years |
| Current cryptographic posture | TLS 1.3, X25519-only key exchange, RSA-2048 certificate |
| Exposure | Directly internet-facing, recordable in bulk |
| Risk verdict | High (X+Y>Z; harvest-now-decrypt-later applies) |
| Treatment and milestone | Enable X25519+ML-KEM-768 hybrid negotiation within 2026 |
| Owner / review date | Platform team / every 12 months |
What makes the register alive is the review cycle. The estimate of Z moves with quantum hardware progress, X moves with the business, and the system inventory moves with every launch and decommission — so recompute the Mosca inequality at least annually and promote newly high-risk systems onto the schedule. Once that loop exists, migration stops being a yes-or-no question and becomes a sequenced programme, and the follow-on work — the CBOM inventory, the pilots, the cutovers — all has a defensible basis.
Risk grading: score likelihood and impact separately
The three-dimensional scoring answers “what to look at first”; grading answers “how high to rate it”. Following the basic approach of general risk-assessment methods such as NIST SP 800-30 and ISO/IEC 27005, split each risk into two independent dimensions — likelihood and impact — grade each separately, and only then combine them into a level, rather than writing “high, medium, low” by intuition alone. In the quantum setting, the likelihood dimension cannot simply reuse the annualised occurrence rates used for conventional threats: it is determined mainly by three factors — the conservative estimate of the threat timeline Z, whether the exposure allows ciphertext to be recorded in bulk, and whether an adversary has a motive to store that ciphertext for a long time. The impact dimension looks at the consequences should disclosure or forgery occur: whether regulated personal information is involved, whether the loss of trust would be irreversible, whether safety-critical functions are affected, and whether the damage could afterwards be remedied by re-encryption, key replacement or certificate revocation.
A simple matrix rule can combine them: high impact with likelihood that is not low is graded high risk, must enter the migration schedule, and must be assigned an owner; high impact but low likelihood is graded medium risk, with a plan drawn up and review triggers set; low impact is graded low risk and simply registered for observation. One point needs stating explicitly: the likelihood of quantum risk rises monotonically over time — a system graded medium today will move automatically towards high risk as Z draws nearer. Grading results must therefore record the grading date and the Z assumption used, and a grade that has passed its review date can no longer serve as a basis for decisions.
Residual risk and acceptance criteria: how the assessment closes
After treatment, a risk usually does not fall to zero; what remains is called residual risk. The assessment report must list residual risk separately: for example, a system may have enabled hybrid key exchange while its certificate chain still uses classical signatures, so the forgery risk remains; or an internal system whose migration is deferred carries residual risk from insiders or from recording made possible after lateral movement. Writing only “treated” without stating the residual risk misleads management into thinking the problem has disappeared.
Whether residual risk can be accepted needs criteria written down in advance, not a decision improvised on the spot. Usable criteria include: whether the impact of the residual risk has fallen within the range the organisation can tolerate; whether the data’s remaining shelf-life is shorter than the conservatively estimated threat timeline; whether workable compensating controls exist, such as network isolation, access auditing and key rotation; and whether the acceptance decision carries a clear expiry and review date. An acceptance decision that reaches its expiry without review lapses automatically, and the risk returns to pending-treatment status. With this closing discipline in place, risk assessment forms a complete loop — identification, scoring, grading, treatment, acceptance and review, each step linked to the next — rather than remaining a one-off analysis report.
References
- M. Mosca, “Cybersecurity in an era with quantum computers: will we be ready?”, IEEE Security & Privacy 16(5), 2018 — https://ieeexplore.ieee.org/document/8473413
- NIST IR 8547 (initial public draft), Transition to Post-Quantum Cryptography Standards — https://csrc.nist.gov/pubs/ir/8547/ipd
- NSA, Commercial National Security Algorithm Suite 2.0 advisory and FAQ (migration timeline framing) — https://media.defense.gov/2022/Sep/07/2003071834/-1/-1/0/CSI_CNSA_2.0_FAQ_.PDF
- Global Risk Institute, Quantum Threat Timeline Report (annual expert survey) — https://globalriskinstitute.org
Tags: Risk AssessmentMosca InequalityHarvest Now Decrypt LaterMigration Planning