Case Study: Project Leap and the Public Sector's Migration Execution Lessons

The BIS Innovation Hub's Project Leap put post-quantum cryptography into a cross-border payments prototype and published the experiment report; in the same period US federal agencies filed cryptographic inventories under executive requirements, and official reports recorded how hard inventory itself was. The public sector's lessons are written in its failures and friction.

Published 22 November 2026 · 6 min read · PQ Frontier

Case Study: Project Leap and the Public Sector's Migration Execution Lessons
AI-generated site artwork
Video explainer · Migration Case Studies: Lessons from Early Movers

Commercial case studies mostly talk about technology; public-sector cases talk about organisation. Payment systems and government systems share constraints: system lifetimes measured in decades, long supplier chains, and every change passing compliance and audit. The best-known public records in this class are two. One is the Project Leap report published in 2023 by the BIS Innovation Hub’s Eurosystem centre, which actually installed post-quantum cryptography into a cross-border payments prototype and tested it. The other is the inventory progress and difficulties disclosed through official channels as US federal agencies advanced migration under NSM-10 and OMB memoranda. Together they form the complete picture of public-sector migration: prototype evidence of technical feasibility on one side, the real friction of organisational execution on the other.

Project Leap: post-quantum cryptography in a payments prototype

Project Leap built an experiment environment close to the real thing: central banks including the Banque de France and the Deutsche Bundesbank participated, and in the prototype system the transmission channel for payment messages was protected with post-quantum cryptography — concretely, a VPN tunnel built on post-quantum algorithms carried payment messages between institutions over a link treated as quantum-threatened, and the payment flow was tested end to end. The report’s conclusions were positive in direction: post-quantum cryptography is technically feasible in a payments setting, performance overhead falls within acceptable bounds, and the real challenges sit at the organisational and coordination level of migration. The experiment’s value is not its scale — it is, after all, a prototype — but that the central banking community carried it out with its own hands and published the report, answering the can-it-work question for the entire financial infrastructure industry. What remains is only the scheduling question.

The inventory problem: what the federal lists revealed

In the same period, US federal agencies inventoried their cryptographic assets and filed priority-system lists as required, and official reports and audits disclosed how hard the inventory itself was: many agencies could not fully answer even the question of which systems use public-key cryptography. The reasons included missing documentation for legacy systems, cryptographic functions embedded deep inside supplier products, and the same algorithms procured repeatedly under different contracts with nobody coordinating. In other words, the first step of migration — inventory — was itself where many agencies got stuck.

That mass inventory also left a methodological by-product: the priority-list system. Faced with assets that could not be inventoried all at once, the official response was not to demand a complete inventory in one pass, but to rank systems by sensitivity first, require agencies to file the list of their highest-priority systems first, and expand coverage year by year. This inventory method — rank first, then proceed in batches — later became the standard pattern in national migration guides. Its wisdom lies in admitting that inventory cannot be completed in one go, and converting it from an examination demanding a complete set into an engineering task demanding an order. It applies to organisations of any size: the first version of a cryptographic inventory only needs to cover the most sensitive systems; completeness can grow through iteration instead of a perfect list holding up the start of the entire migration. The contrast with the commercial cases is sharp: browsers and cloud providers argue about algorithms and byte counts, while the public sector argues about asset visibility. The lesson for later movers is direct: if your organisation cannot state clearly where its cryptographic assets live and who owns them, then before discussing algorithm selection, estimate the inventory effort under worst-case assumptions. It is usually larger than imagined.

The collaboration shape: why the public sector must migrate as a group

That Project Leap was carried out jointly by several central banks and the BIS is no accident. Participants in payment and government systems are interconnected; one institution’s migration progress is constrained by counterparties and shared suppliers, and unilateral action cannot close the loop. The public sector’s answer is to run migration as a collective project: shared test environments, aligned standard selections, and mutual discipline through a common timetable. The Leap report itself is a product of that collaboration — experiment design, algorithm choices and conclusions were all published as multi-party consensus. The same holds for large enterprise groups: for interconnected systems spanning subsidiaries and supply-chain partners, the migration plan must include a counterparty coordination mechanism, or your own cut-over will be locked by the slowest link in the chain.

The prototype’s boundary: questions Leap did not answer

Read the Leap report for its boundaries as well. The prototype environment moved no real funds, involved a limited number of institutions and ran under controlled network conditions, so it answers whether things work at the cryptography and protocol level — not whether they work at production scale: performance headroom under high concurrency, integration details with hardware security modules, operating procedures and incident handling, and change management coordinated across time zones all remain to be validated in later phases. The report itself is honest about this, positioning the experiment as early evidence on the migration route and pointing to the follow-up work. That honesty is the correct way to read prototype cases: confine its conclusions to the scope it actually verified, and mark everything beyond that scope as unverified in your own plan, rather than using a prototype report to underwrite an entire production migration. The public sector’s other lesson sits here too: after Leap, progress advanced through each institution’s own programme — prototype success does not automatically convert into a production timetable. Organisational execution remains the bottleneck of the second half, which bookends the federal inventory lesson exactly.

What can be copied

Three organisational lessons can be taken from this case: validate the feasibility of your own industry’s scenario with a prototype instead of waiting for vendor assurances; treat inventory as a standalone project with its own time and authority; and design multi-party coordination mechanisms in advance for interconnected systems. What cannot be copied is the public sector’s mobilisation power — executive orders and regulatory timetables are levers enterprises do not have. But enterprises have equivalents of their own: internal audit requirements, customer compliance questionnaires and board-level risk resolutions. Hanging migration on these existing governance hooks is the most practical trick an ordinary organisation can learn from the public-sector cases.