← Back to section · Post-Quantum Migration
Readiness Maturity Levels: Defining Four Levels and Running a Self-Assessment
The value of maturity grading is not the level itself but whether each level's criteria are verifiable. A four-level scheme, criteria written as checkable facts, and a self-assessment method built on evidence anchoring, dual rating and negative-evidence retention.
An assessment framework answers “which aspects do we look at”; maturity grading answers “how far along is each aspect”. Various five- and six-level capability schemes circulate; the number of levels matters far less than whether each level’s criteria can be verified. This article sets out a four-level scheme and a self-assessment method. One disclaimer first: this grading is a methodological proposal from this article and does not correspond to any agency’s official model. Public materials from bodies such as CISA do advise organisations to assess their readiness, but no unified official grading table exists, and readers should not mistake any informal scheme for a compliance requirement.
Four levels: from unaware to systematic
A practical four-level scheme can be defined as follows:
Level 0 — Not started. The organisation has no quantum-safe inventory, owner or plan; discussion is limited to individual employees’ personal interest. Hallmark: no written artefact of any kind can be produced.
Level 1 — Aware. An initial inventory or local experiments exist, but they are project-based and one-off; ownership is fuzzy; there is no written policy. Hallmark: artefacts exist, but nobody maintains them and there is no update mechanism.
Level 2 — Systematic. Inventory is a process, policy is written, ownership is explicit, supplier enquiries have been sent, and at least one technical pilot has been completed with data recorded. Hallmark: artefacts have owners, a cadence, and a review schedule.
Level 3 — Measurable. On top of level 2, readiness has quantitative metrics and trend tracking, pilot conclusions have flowed back to revise plans, and exceptions and risks are formally registered and handled. Hallmark: management can answer with data — “are we better prepared than last year, and where exactly?”
Note how the boundaries are drawn. From 0 to 1 the question is “does it exist”. From 1 to 2 it is “is it alive” — the difference between a one-off artefact and a continuing mechanism. From 2 to 3 it is “can you prove progress”. All three boundaries are factual questions that can be checked, not matters of the rater’s subjective impression.
A common question in grading: when the five dimensions sit at uneven levels, should a single composite level be reported? Better not. A composite inevitably hides structure — an organisation at level 3 in inventory and level 0 in skills can score the same composite as one hovering around level 1 everywhere, yet the first lacks people and the second lacks accumulation, and the responses are entirely different. When a conservative external figure is needed, the lowest dimension’s level can serve as the floor (readiness is bounded below by its shortest stave), but internal planning must always use the full five-dimension portrait.
Criteria themselves also expire with the environment: standards being published, regulatory timetables firming up and mainstream supplier support landing all raise what “broadly ready” actually means. Criteria text should carry a version and revision date, and the annual review should examine the criteria as well as the ratings — a level 3 awarded under criteria from three years ago is not the same thing as a level 3 under this year’s.
Write criteria as factual statements
The most common failure of grading schemes is criteria written as adjectives: “inventory is fairly complete”, “governance is relatively sound”. Adjective criteria cannot be checked, and self-assessment inevitably inflates. The correct form is to write each criterion, for each level and dimension, as a countable or testable factual statement. For example, the level-2 criterion for the inventory dimension might read: “The inventory covers all production systems and externally facing services, was last updated within six months, and a random check of five systems finds no more than one discrepancy between the inventory and actual configuration.” A rater can take such a criterion and check it; the result is either met or not met.
Criteria should also include a negative list: conditions that cap the level outright. If “the inventory of critical systems is missing or has not been updated for over a year” holds, the inventory dimension may not be rated above level 1 — however polished the other materials look. The negative list is the most effective anti-inflation device, because it turns the flaws most easily hidden into hard constraints.
The self-assessment method: three steps, three anti-inflation designs
Step one: gather evidence first. Collect each dimension’s evidence — inventories, policy documents, enquiry records, pilot reports — and only then rate against the criteria. Any rating without supporting evidence is scored at the lowest band by default: “we discussed it in a meeting” is not evidence.
Step two: independent dual rating. Two people rate separately against the criteria, with reasons, and then compare. The disagreements are the most valuable output: they expose ambiguous criteria and missing evidence, and should be recorded and resolved one by one — not averaged away.
Step three: keep the negative evidence. The self-assessment report should carry a dedicated section, “known non-conformities”, listing honestly the discrepancies the spot-checks found, the stale materials and the missing records. A self-assessment with no non-conformities at all is the least credible kind — it means the checking was not thorough enough.
After grading: the level is a starting point, not a medal
The real output of grading is, for each dimension, the list of conditions for reaching the next level. For the inventory dimension to move from level 1 to level 2, for instance, three things are missing: wiring the inventory process into the change-management workflow, naming a maintainer for the inventory, and scheduling a six-month review. That list is the input to gap analysis and converts directly into action items in the plan.
Beware one misuse: treating the level as a publicity badge or a performance target. The moment levels are tied to rewards and penalties, inflated self-assessment becomes almost inevitable. The level has exactly one legitimate use — helping the organisation decide where to spend its next effort. The systematic distortions most common in self-assessment — overestimating inventory coverage, underestimating long-tail systems — are covered in a companion article. Grade solidly first, and the organisation’s self-portrait will not be a beautified one.
Tags: maturity modelself-assessmentreadiness