← Back to section · Security Risk & Assessment

Quantum Risk Assessment Models: From Mosca's Inequality to a One-Page Worksheet

Mosca's inequality in depth, quantum-safe maturity levels, and the risk-matrix method — combined into a one-page assessment worksheet an organisation can fill in directly, with a worked example.

Published 22 November 2026 · 6 min read · PQ Frontier

Quantum Risk Assessment Models: From Mosca's Inequality to a One-Page Worksheet
AI-generated illustration by PQ Frontier
Video explainer · Risk Assessment Models: from signed evidence to ranked risk

Why a model at all

Nobody knows the year a quantum computer breaks RSA. That is not a reason to postpone assessment. A risk model’s job is not prophecy; it is to convert an uncertain future into a sortable, decidable action list for today. Practice has converged on three layers: Mosca’s inequality for urgency, a maturity model for capability, and a risk matrix for ordering systems.

Mosca’s inequality in depth

The inequality has three variables: X (data shelf life, in years), Y (years needed to migrate), Z (years until a cryptographically relevant quantum computer exists). X+Y>Z means you are already late. All the difficulty is in the estimates:

Estimating X. Derive it from data type, regulation and business need. Medical records, archives and contracts carry statutory retention and secrecy periods; trade secrets follow the competitive window; when in doubt, round up. X is the most controllable of the three variables — it is written in your own data-classification policy.

Estimating Y. Scale by organisation size and system complexity. A full migration for a large institution — inventory, pilots, vendor replacement, rollout, validation — realistically takes 5–10 years; a mid-size organisation 2–5 years; a single system possibly months. The most common source of underestimation is dependencies: waiting for vendors to ship PQC versions, for standards to finalise, for hardware refresh cycles. None of these are on your schedule, yet all of them consume Y.

Estimating Z. No single organisation should guess Z alone. Use published expert-consensus ranges, such as the probability estimates aggregated in the Global Risk Institute’s annual Quantum Threat Timeline Report. The correct technique is sensitivity analysis: run the numbers with an optimistic Z (say 20 years) and a conservative Z (say 10). If the verdict is “already late” under both, the decision does not need a more precise Z.

A quantum-safe maturity model

Maturity models grade organisational capability so expectations can be aligned (details vary between frameworks; the following five levels summarise common practice):

Level State Typical characteristics
L0 Not started Unaware Does not know which systems use quantum-vulnerable algorithms
L1 Inventoried Has a list Cryptographic inventory (CBOM) complete; exposure located
L2 Planned Has a roadmap Risk assessment and priorities done; plan and budget approved
L3 Migrating Partially live Key systems run hybrid/PQC; crypto-agility in place
L4 Migrated Complete Main systems on PQC; residual exposure formally risk-accepted
L5 Operational Business as usual New systems quantum-safe by default; standards and threat monitored continuously

The point of the maturity grade is honest scheduling: an L0 organisation promising “migration in three years” is not credible — its Y must first include the climb from L0 to L2.

The risk-matrix method

For individual systems, sort on two axes: exposure (shelf life × whether data crosses untrusted networks × likelihood it is already being harvested) and migration difficulty (in-house and controllable / vendor-dependent / embedded and hard to update). Move first on the high-exposure, low-difficulty cell — typically the external TLS gateway, where hybrid key exchange can be switched on today. The high-exposure, high-difficulty cell (industrial embedded systems, for instance) needs the earliest project start, because its Y is the longest.

Common traps in estimating the variables

Each variable has a characteristic bias that an assessment should check explicitly. First, X is often estimated as the average shelf life of the data in a system, but risk is set by the long tail: if a mostly short-lived system holds even a small amount of long-shelf-life records, X should be taken from that longest part, not the average. Second, Y is often counted as in-house rework only, omitting vendor waits, standards and regulatory approval, and cross-organisation integration testing — in practice these off-schedule items are frequently longer than the development work itself. Third, Z must never be a single point from a single source: media claims of “broken by year X” are usually a misreading of an expert distribution; the correct approach is to go back to the primary source such as the GRI report, take the distribution, and state which quantile you used.

A further subtlety is that the variables are not independent. An earlier Z compresses everyone’s migration window at once, and the resulting industry-wide rush on vendor capacity lengthens each organisation’s Y — if everyone waits until the last moment, the vendors’ delivery queues become the bottleneck. Accounting for this correlation only pushes the conclusion further toward starting early. Finally, estimates should leave an audit trail: record the assumption behind every number — the data-classification basis, the vendor commitment, the report vintage for Z — in the worksheet notes, so that next year’s review can see exactly which variable moved instead of starting over.

The one-page worksheet

Compress the three layers into one table, one row per system. A security team can draft it in a single workshop:

System Shelf life X (yrs) Migration Y (yrs) X+Y Verdict at Z=15 Exposure Difficulty Priority
Public web TLS gateway 3 0.5 3.5 Safe Medium Low P2 (enable hybrid now)
Electronic health records 30 6 36 Already late High Medium P0
Long-term archive backups 25 2 27 Already late High Low P0 (re-encrypt first)
Internal office systems 2 3 5 Safe Low Medium P3 (normal cycle)
Industrial device keys 15 8 23 Already late Medium High P1 (start project now)

Usage notes: the verdict column answers only “late or not”; the priority column then applies exposure and difficulty for the final order. Write the chosen Z in the table header, keep it uniform across the sheet, and re-run the exercise yearly against the latest threat-timeline report. Once the sheet is filled in, management’s three questions — which systems are most at risk, how long will it take, what do we do first — all fit on one page.

One final caution against a common misuse: treating the assessment as a one-off project. X changes as new business systems go live, Y changes with vendor progress, and expert consensus on Z is revised every year. The worksheet should be a living document on the annual security-governance agenda, not a consultancy deliverable filed away after one workshop. The model does not remove risk; it removes the state of not knowing what to do first.

References

  1. Mosca, M., Cybersecurity in an era with quantum computers: will we be ready?, IEEE Security & Privacy 16(5), 2018. https://ieeexplore.ieee.org/document/8473413
  2. Mosca, M., Piani, M., Quantum Threat Timeline Report, Global Risk Institute, 2024. https://globalriskinstitute.org/publications/quantum-threat-timeline-report-2024/
  3. NIST NCCoE, Migration to Post-Quantum Cryptography. https://www.nccoe.nist.gov/crypto-agility-considerations-migrating-post-quantum-cryptographic-algorithms
  4. UK NCSC, Preparing for quantum-safe cryptography, 2020. https://www.ncsc.gov.uk/whitepaper/preparing-for-quantum-safe-cryptography

Tags: Mosca inequalityrisk assessmentmaturity modelrisk matrix