Global Migration Timelines Compared: CNSA 2.0, NIST IR 8547, the EU and the UK

The major official timelines on one table: what must be done by 2030, the shared 2035 endpoint, and which line an enterprise should plan against.

Published 21 November 2026 · 7 min read · PQ Frontier

Global Migration Timelines Compared: CNSA 2.0, NIST IR 8547, the EU and the UK
AI-generated artwork created for PQ Frontier
Video explainer · Migration Timelines: Official Milestones Compared

The most common migration question — “by when, exactly?” — is answered not by any single document but by the intersection of several official timelines. Laid side by side, they agree more than you might expect.

The United States: CNSA 2.0 and NIST IR 8547

CNSA 2.0 (NSA; binding on national security systems and their suppliers) is the most concrete table available:

  • Software and firmware signing — prefer CNSA 2.0 algorithms (ML-DSA, LMS/XMSS) from 2025; classical signing out of default use by 2030;
  • Networking, VPN and TLS — phased switch to ML-KEM and ML-DSA across 2026–2030;
  • Operating systems and cloud services — complete by 2030–2033;
  • 2035 — quantum-vulnerable algorithms essentially eliminated from national security systems.

NIST IR 8547 (2024 draft) draws the algorithm retirement line: from 2030, classical public-key algorithms at ≤112-bit security (RSA-2048, ECDH P-256 and peers) are deprecated; from 2035, disallowed. It formally binds federal systems and FIPS-validated products — and reaches everyone else through the supply chain.

The EU and the UK

European Union. The coordinated roadmap published in April 2025 (under the NIS Cooperation Group) recommends member states start migration and complete inventories and plans by the end of 2026, finish high-risk systems by the end of 2030, and complete the transition as far as possible by 2035. The EU additionally ties migration to product law such as the Cyber Resilience Act — products sold into the EU will need cryptographic inventories and upgrade paths.

United Kingdom. NCSC guidance (2025) sets three milestones: discovery and prioritization by 2028, highest-priority systems migrated by 2031, full migration by 2035. It is written as self-directed organizational planning and is the most borrowable template for unregulated industries.

Other signals worth noting

  • Canada and Australia — the CCCS expects federal transition plans aimed at 2035; Australia’s ASD ISM guidance puts classical public-key retirement around 2030, among the more aggressive dates in the major economies;
  • Finance — FS-ISAC, central-bank and payment-network position papers consistently rank payment and interbank systems as high priority, and cross-border interoperability windows will close earlier than any single national table;
  • China — an independent standards and research track (commercial-cryptography system plus domestic PQC research); cross-border systems need dual-track planning.

How an enterprise should use this table

  1. Adopt the strictest line that touches you — a US government supply chain, an EU market, or financial customers each import their deadlines into your plan;
  2. 2030 is the real hard node — high-priority systems (external TLS, signing, long-shelf-life data) land around 2030 in every table; plan backwards from “high-priority migration done by end of 2029”;
  3. 2035 is the zero line — budget and architecture should assume classical public key exits production by 2035;
  4. Timelines move, direction doesn’t — every revision so far has made these tables finer and firmer, never looser. Building the CBOM inventory first is the step that is correct under every version of every table.

What drives these timelines

The dates were not picked out of thin air; three forces push them.

First, “harvest now, decrypt later.” Attackers can record encrypted traffic and ciphertext today and decrypt it once quantum computers are capable enough. A system’s real deadline therefore depends not on the year a quantum computer arrives, but on how many years its data must stay secret. The common test compares three spans of time: the data’s confidentiality lifetime, the years migration will take, and the years until a cryptographically relevant quantum computer might arrive — if the first two add up to more than the third, it is already too late.

Second, replacement cycles are long. Cryptographic algorithms are embedded in protocols, certificates, firmware, hardware security modules and vendor products; swapping them out means selection, certification, procurement, deployment and interoperability testing — a full cycle measured in years.

Third, the standards have landed. In August 2024 NIST published the first post-quantum standards (FIPS 203, FIPS 204 and FIPS 205, covering ML-KEM, ML-DSA and SLH-DSA respectively). Migration finally had fixed algorithmic targets, and timelines could turn from statements of principle into dated plans.

One table, four kinds of binding force

Read side by side, these timelines must be read by binding force first and date second — the same “2030” can mean entirely different things.

  • Binding mandate — CNSA 2.0 is a hard requirement for US national security systems, transmitted to suppliers through contract terms; its dates are not negotiable;
  • Draft standard — NIST IR 8547 is still a draft; the deprecate-in-2030, disallow-in-2035 framing may still be fine-tuned in the final version, but it marks the direction of the federal compliance system, and suppliers must position against it early;
  • Coordinated recommendation — the EU roadmap was issued as a recommendation and is not itself legislation directly binding on companies, but once connected to product law and member-state national plans it converts into real market-access pressure;
  • Official guidance — the UK NCSC timeline is guidance, with no penalties, but it is becoming the default reference in UK procurement questions and board reporting.

To judge how hard a timeline is, look at three things: whom it binds, through what mechanism it is transmitted, and what non-compliance costs. Copying years alone into an internal plan tends to mistake recommendations for orders and orders for recommendations.

How an enterprise aligns its schedule: turning external dates into internal milestones

External timelines give the finish line; the enterprise has to break it into internal milestones it can actually execute:

  1. Set the anchor — first establish which lines bind you: US federal supply-chain business, products sold into the EU, financial-sector customers. Take the earliest set of dates as your internal anchor instead of waiting for your own regulator to publish;
  2. Derive per-system deadlines from data lifetimes — account for each system separately. A system whose data must stay secret for ten years has an effective deadline far earlier than one with a one-year lifetime; the highest-risk surfaces — external TLS and code signing — go in the first batch;
  3. Move in three waves — wave one is inventory and crypto-agility: find where the cryptographic assets are (CBOM) and make systems able to swap algorithms; wave two migrates high-priority systems; wave three handles the long tail of legacy systems, embedded devices and industrial systems that cannot be taken offline — these have the longest cycles and, paradoxically, need their discovery started earliest;
  4. Write the dates into procurement terms — in new purchases and renewals, require suppliers to provide a post-quantum roadmap and cryptographic-inventory support. Many enterprises’ migration pace is ultimately set by their suppliers’ product cadence, and the contract is the strongest alignment tool there is.

Internal checkpoints should sit well ahead of the official dates: an official milestone is a final deadline, and if the internal milestone falls in the same year, a single supplier delay turns directly into non-compliance.

Uncertainty and rolling revision: why plans need slack

Finally, be clear about what these timelines are: not predictions of quantum-computing progress, but risk-management tools. IR 8547 is still in draft; the EU roadmap depends on member states turning it into national plans one by one. Details will change — that is the norm, not an accident.

Two implications follow. First, layer the plan: write what is settled (such as completing high-priority migration before 2030) into commitments and budgets, put what is still in draft on a watch list, and re-check the official documents at least once a year. Second, prioritize investment in what pays off however the timelines move — cryptographic inventory, crypto-agility, supplier contract terms; none of that work is wasted under any revision. Betting everything on one specific year, or waiting until every document is final before starting, are both misreadings of this table.