← Back to section · Post-Quantum Migration
A Five-Step Roadmap for Post-Quantum Migration
Migration is not swapping one algorithm — it is replacing cryptography everywhere an organisation uses it. Inventory, assess, sequence, pilot, switch: each step with a deliverable.
The hard part is not the algorithm
ML-KEM implementations already ship in every mainstream cryptographic library. The hard part is that in a mid-sized organisation, RSA and elliptic curves hide in hundreds of unexpected places — firmware signatures, database encryption, internal RPC, backup formats, vendor SDKs, a single-sign-on system from a decade ago. The first principle of migration engineering: you cannot replace what you cannot find.
The five steps below compress the migration guidance published by NIST, the NSA and others into an executable route. Each step names its deliverable — a step without a deliverable did not happen.
Step 1 — Inventory: draw the cryptographic map
Deliverable: a Cryptography Bill of Materials (CBOM).
- Scan code, configuration, certificate stores and dependency trees; record every use of public-key cryptography: algorithm, key size, purpose, owning system;
- Do not miss the three blind spots: hardware and firmware (HSMs, TPMs, device signing), third-party components (SDKs, how SaaS products connect), and the data layer (how keys are wrapped for storage and backups);
- The CycloneDX CBOM format and open-source scanners already exist — the inventory does not have to be manual.
Step 2 — Assess: schedule with the Mosca inequality
Deliverable: a risk register graded by data secrecy lifetime.
The Mosca inequality frames the judgement: if the secrecy lifetime your data needs (), plus the time migration will take (), exceeds the time until the quantum threat arrives (),
then the risk already exists. Ask of every data class: “If this is decrypted in ten years, is that acceptable?” What is acceptable waits; what is not — medical records, state secrets, long-term contracts, identity data — forms the first migration wave.
Step 3 — Sequence: key exchange before signatures
Deliverable: a phased priority table of systems.
The ordering follows from the harvest-now-decrypt-later asymmetry (see this site’s article on hybrid key exchange):
- Key exchange in external TLS and VPNs — the recorded-traffic risk is accumulating today;
- Key exchange and data encryption between internal services;
- Signature systems — certificate chains, code signing (less urgent, but slow; start early);
- The long tail: firmware signing, archived data, offline media.
Anchor to the hard timelines: the NSA’s CNSA 2.0 requires US national security systems to complete the transition between 2030 and 2033, and the ecosystem will be pulled along by that schedule.
Step 4 — Pilot: hybrid deployment, small and measured
Deliverable: a pilot report — performance baseline, compatibility list, rollback plan.
- Pick one system with clean boundaries and pilot hybrid key exchange (classic + post-quantum);
- Measure three things: handshake latency and packet-size changes, compatibility with legacy clients and middleboxes, and whether monitoring can actually see the negotiated result;
- The rollback switch must be real: one action returns the system to classic-only mode.
The goal of this phase is not “going live” — it is converting unknown pitfalls into a known list.
Step 5 — Switch, then normalise: crypto-agility
Deliverable: a repeatable switching procedure plus continuous inventory.
The end state is not merely “migrated once” but crypto-agility: algorithms exist as configuration, not code, so the next algorithm transition — there will be one — costs an operation, not an engineering programme. After the switch, step 1’s inventory becomes a standing scan: new systems enter the register on arrival, and only then is the loop closed.
Phases and milestone criteria: every step must be verifiable
The five steps most easily fall short when “worked on” is mistaken for “done”. Each phase should state its exit criteria in advance, and the next phase should not begin until they are met. The criterion for inventory is not that a scanner has run once, but that every use of cryptography has a clearly identified owning system and owner, and that each blind-spot category is given a conclusion. The criterion for assessment is that every important class of data is labelled with a secrecy lifetime, with anything that cannot be judged defaulting to the longer lifetime. The criterion for sequencing is that every system has an assigned wave and a statement of its prerequisites — for example, having to wait for vendor support or upgrade the protocol stack first. The pilot criteria are the strictest: a performance baseline, a compatibility list and a rollback drill are all indispensable, and the rollback must actually have been rehearsed. The criterion for switching is that legacy algorithms have a shutdown date and an exception-approval process, exceptions carry an expiry date, and dual-stack operation cannot continue indefinitely.
A prioritisation method: secrecy lifetime times exposure
Between steps two and three, a reusable ordering method is needed so that not every system can claim to be the most important. A practical approach is a two-dimensional matrix: one dimension is the data secrecy lifetime — identity credentials, health information and long-lived signatures fall into the long-lifetime category; the other is exposure — whether an attacker can reach the ciphertext or signature without entering the internal network. Externally facing services, long-archived backups and files distributed externally have large exposure, while transient data inside isolated networks has small exposure. Systems high on both dimensions enter the first wave; systems low on both sit in the long tail but must still be registered; the rest are handled according to their backup and archive paths and opportunities to upgrade the protocol stack. Two correction factors are then applied: migrating shared foundation components first amplifies the benefit, and for external components that do not yet support post-quantum algorithms, requirements should be raised early and folded into procurement evaluation.
Governance and ownership: migration needs a clear owner
Migration spans security, engineering, operations, procurement and legal, and without a single accountable body the most common outcome is every team waiting for someone else to move first. A workable governance structure has three layers: a decision layer of security and technology leaders, which approves wave plans, exceptions and budgets; an execution layer with a dedicated migration coordination role, which maintains the cryptographic inventory, tracks progress and organises pilots and reviews; and a system layer in which the existing owner of each application and piece of infrastructure carries out and verifies the change for their own system and signs off the inventory entries that belong to them. Procurement must be part of the governance structure: new purchases should be required, as an acceptance condition, to disclose a cryptographic inventory and a post-quantum support roadmap, and existing vendors should be asked regularly about their support plans, with their answers recorded. The key to governance is not the organisation chart but three named responsibilities: who maintains the inventory, who approves exceptions, and who reports progress.
From pilot to rollout: waves, metrics and review
A successful pilot does not mean everything can be switched at once. The sound rhythm is a rollout in waves: first migrate systems with clean boundaries and few dependencies; then handle core business systems, scheduled in off-peak periods with a rollback window reserved; finally address the long tail of firmware, archives and offline media, completing them gradually alongside device replacement or media rotation. After each wave, hold a review that always examines four kinds of metric: coverage, the share of inventory entries already migrated out of the total; operational quality, such as the success rate of hybrid key exchange, a classification of failure causes, and performance change relative to the baseline; the exception stock, meaning the number of entries still running legacy algorithms, their expiry dates and owners; and inventory freshness, meaning the time since the last full review and how new systems are being registered. Review conclusions must be written back into the roadmap itself: where ordering assumptions are disproved, later waves are adjusted, and newly discovered blind spots are added to the inventory’s scope.
Takeaway
The order of the five steps is itself the risk ranking: see first (inventory), judge second (assess), act last (sequence, pilot, switch). Organisations that skip the inventory and start swapping algorithms always repay the time later — usually at a firmware signature or a vendor SDK.
Sources
- NIST IR 8547 (draft): Transition to Post-Quantum Cryptography Standards, initial public draft, November 2024
- NSA: Commercial National Security Algorithm Suite 2.0 (CNSA 2.0) and its migration timeline — https://www.nsa.gov
- CISA: Post-Quantum Cryptography Initiative — https://www.cisa.gov/quantum
- CycloneDX: the CBOM (Cryptography Bill of Materials) specification — https://cyclonedx.org
Tags: Migration RoadmapCrypto-AgilityCBOMRisk Assessment