Articles here
Cut-over Strategies Compared: When Big Bang, Gradual, and Dual-Track Each Apply
There is more than one way to cut over. One-shot switching, wave-by-wave gradual migration, and running classical and post-quantum in parallel have completely different risk shapes; the choice depends on system coupling, rollback cost, and external deadlines.
Cut-over strategiesGradual migrationDual-track
Acceptance and Metrics: What Evidence Decides That a Migration Is 'Done'
Migration completion is not a feeling; it is evidence: coverage, actual negotiation share, the residual-risk register, and proof that classical algorithms are retired. The metrics system must resist inflation while still letting management and auditors grasp the state in one sentence.
Migration acceptanceMetricsCompletion criteria
Migration Governance and Roles: Who Decides, Who Executes, Who Accepts
Migrations rarely fail on technology; they fail because nobody has authority to decide and nobody owns the exceptions. A governance model settles four things: decision rights, execution responsibility, acceptance authority, and exception authority.
Migration governanceRoles and responsibilitiesMigration office
The Discovery Phase: Scope, Methods, and the Completeness Argument
The discovery phase does three things: draw the inventory boundary explicitly, cross-check with multiple discovery methods, and produce a defensible argument for the inventory's completeness. Inventory is not 'scan the code once'; it is the foundation work of the entire migration.
Discovery phaseCryptographic inventoryMigration foundation
Five Migration Phases and Stage Gates: A Phase Without Criteria Is No Phase at All
The methodological skeleton of post-quantum migration is five phases joined by four stage gates: discovery, assessment, pilot, rollout, and closure. Each phase has defined deliverables; each gate has checkable entry and exit criteria.
Migration methodologyStage gatesMigration phases
The Prioritization Framework: Ranking and Wave Planning as a Method
After inventory, you do not work down the list in order — you prioritize: data secrecy lifetime and harvest-now-decrypt-later risk as the primary axis, corrected by exposure, dependency structure, and replacement difficulty, cut into waves so the earliest effort lands where the risk is highest.
PrioritizationWave planningMigration sequencing
Pilot Selection Principles: Pick Systems That Expose Problems, Not Systems That Look Good
A pilot's value is exposing the unknown early: representative coverage, controllable blast radius, feasible rollback, and success criteria fixed in advance. Choose the wrong pilots and rollout will amplify their blind spots a hundredfold.
Migration pilotSelection principlesPilot validation
Rollback Planning: Trigger Conditions, the Rollback Window, and What Cannot Be Rolled Back
Rollback is not a sentence like 'if something goes wrong, revert.' A plan must specify trigger thresholds, the decision-maker, where the rollback window starts and ends, and which changes are inherently irreversible and can only be fixed forward.
Rollback planningMigration riskCut-over safety