← Post-Quantum Migration

Migration Risk Assessment

Identifying, quantifying and ranking migration risks.

A subcategory of Post-Quantum Migration, collecting its introduction, articles and resource entry points.

§

Articles here

22 Nov 2026 Post-Quantum Migration

Archived Data Risk: Backups and Archives Are Migration's Last Mile

Migrating the online systems does not zero the risk: backups, archives and cold data often sit for years under old algorithms. This article assesses the distinctive risks of archived data and the three treatment routes — re-encryption, isolation and destruction.

archived databackup encryptionre-encryptiondata destruction

Read more →
22 Nov 2026 Post-Quantum Migration

Dual-Running Risks: The Most Dangerous Part of Migration Is the Transition Itself

The years in which classical and post-quantum algorithms run side by side carry their own downgrade, drift and complexity risks. This article breaks down four transition-specific risks and how to manage dual-running deadlines.

dual runningdowngrade attackshybrid schemestransition period

Read more →
22 Nov 2026 Post-Quantum Migration

Interoperability and Compatibility Incident Risk: New Algorithms Meet Old Networks First

Post-quantum algorithms' larger keys and signatures collide with middleboxes, legacy protocol stacks and peer implementation differences. This article assesses the typical shapes of interoperability risk and how to design a pre-launch test matrix.

interoperabilitycompatibility testingstaged rolloutincident prevention

Read more →
22 Nov 2026 Post-Quantum Migration

Risks of the Migration Project Itself: Delay, Rollback and Change Drift

The object of risk assessment is not only the systems being migrated, but the migration programme itself. This article covers delay chains, missing rollbacks and scope creep, and how to design against them at scheduling time.

project riskrollback planningchange managementscheduling

Read more →
22 Nov 2026 Post-Quantum Migration

Migration Risk Assessment: Do the Time Arithmetic First, Then Set Priorities

Post-quantum scheduling turns on one inequality: if data shelf-life plus migration time exceeds the time until the quantum threat arrives, you are already late. Here is the full method — risk matrix and risk register included.

Risk AssessmentMosca InequalityHarvest Now Decrypt LaterMigration Planning

Read more →
22 Nov 2026 Post-Quantum Migration

Risk Treatment Decisions: When Migration, Mitigation and Acceptance Each Hold

Assessment ends in treatment decisions. This article states the conditions under which each of the main treatment types is justified, the approval and record-keeping requirements for accepting risk, and how residual risk feeds the next assessment round.

risk treatmentrisk acceptanceresidual riskgovernance

Read more →
22 Nov 2026 Post-Quantum Migration

Secrecy Horizon × Exposure: Drawing the Risk Matrix onto the Data

Mosca's inequality gives the time arithmetic; scheduling needs a two-dimensional matrix: secrecy horizon on one axis, exposure surface on the other. This article explains how to measure both axes and how each cell maps to a treatment action.

risk matrixdata classificationexposure surfacesecrecy horizon

Read more →
22 Nov 2026 Post-Quantum Migration

Vendor Dependence and Lock-In Risk: Your Migration Clock Is in Someone Else's Hands

Much cryptographic capability hides inside vendor products, cloud services and libraries, so migration pace is hostage to their roadmaps. This article assesses where lock-in risk comes from, how to score it, and how contracts can hedge it.

vendor risklock-incontract clausesexit strategy

Read more →
§

More in this section